国产m3u8在线观看-国产mba-国产mv日韩一区-国产mv天美传媒-国产mv在线观看免费-国产ol丝袜高

Current Location:Home > Product > IF induction series > Silicon controlled medium frequency forging furnace

2020-07-21 16:25:04

Share
  • Share to WeChat Moments

Infrared temperature measurement forging furnace

  • Description

Operation steps of infrared temperature measurement forging heating furnace

1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


Maintenance of Forging Furnace with Infrared Temperature Measurement

When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

高頻10.jpg



Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 午夜视频久 | www.国产精品 | 国产精品区二 | 日韩一级大片国产 | 三级一区二区 | 欧美一级性爱视屏 | 日韩欧美网站 | 国产美女脱的黄的全 | 91直播| 欧美性十八 | 国产精品色哟哟网站 | 日韩BD| 国产偷精品免费观看 | 另类亚洲图片 | 日本精品在线播放 | 国产肥熟老 | 国产最美特| 97视频观看 | 国产女人成人精品视 | 国产福利在线视频 | 国产自产中文综合网 | 91影院免费在线 | 国产欧美午夜视频 | 国产韩国精品一区二 | 国产精品亚洲日本 | 九九视频免费在线观 | 国产精品最新高清 | 精品国产亚洲一 | 日本高清视频色惰 | 日本精品三级在线看 | 欧美自拍视频 | 日本成人区 | 成人动漫一区二区三 | 午夜激情影 | 国产尤物在 | 日韩天堂在线视 | 国产精品午夜视频 | 国产在线午夜 | 国产青青手机在 | 午夜在线观看亚 | 日韩精品在线开放 |