Operation steps of round steel forging diathermy equipment and bar diathermy forging equipment

1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


Maintenance of round steel forging diathermy equipment and bar diathermy forging equipment

When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

高頻10.jpg


Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 成人免费视频大全 | 露脸国产| 国产色女 | 国产又大又粗 | 国产高清欧美亚洲 | 区二区在线2025 | 欧美综合亚洲 | 国产网站免费视频 | 国产国产成 | 日本中文字幕免 | 国产粉色白 | 成人免费看一级特黄 | 欧美在线视频一区 | 成人国产免费 | 九九综合黑白配久 | 人人添人人透人人澡 | 福利导航小视频在线 | 中文字幕人 | 国产肥熟 | 女同蕾丝一 | 国产在线精品91国 | 国产区最新视 | 91桃色| 蜜桃成熟 | 国产美女91 | 午夜福利体验区 | 欧美专区中文字幕 | 动漫精品一区二区 | 欧美综合五月 | 玖玖爱这里只有精品 | 日本精高清区一 | 国产51社区 | 日本三级国产乱伦 | 日韩欧美午夜视频 | 国产综合成人色产三 | 日韩AⅤ在线 | 三级网站大全 | 热99精品视频 | 国产91视频一区 | 日韩毛A| 国产午夜福利精品 |